SNGPL New Connection Procedure – SNGPL Application Status Check By CNIC

Sngpl new connection procedure Serving the energy needs of homes, businesses, and different areas all over Pakistan, Sui Northern Gas Pipelines Limited (SNGPL) offers a simple and efficient way to get a new gas connection. If you’re looking to obtain a new gas connection from Sui Northern Gas Pipelines Limited (SNGPL) and are unfamiliar with the process, this article today will provide you with a complete step-by-step guide. By following these steps, you can easily acquire your new gas connection in a short period. “What documents are required to activate an SNGPL new gas connection? And besides this, all the questions that may be on your mind about getting a new connection will be answered after reading today’s article.

Now, let’s start without wasting your time. You must follow these steps and get a new gas connection quickly.

How to Get a New SNGPL Gas Connection: A Step-by-Step Guide

“Before you apply for a new home gas connection, remember these simple things. The option to apply through the website is available for those applying for domestic gas connections.

SNGPL application submission online

Apply online for a domestic gas connection where the gas pipeline is already in front of your house.”Please apply for a gas connection only if your property is already on the SNGPL’s gas network, or your application might get denied during the survey or before that.”

  • If you’re a homeowner, use the website to apply.
  • Make sure your home is in an area where SNGPL provides gas. Applications for places without gas service might get rejected.
  • Give your full and accurate address, and mention a nearby landmark if your address isn’t very clear.
  • Provide your valid CNIC (Computerized National Identity Card) and a working mobile number.
  • Scan and upload clear pictures of your property documents. If there are many pages, save them as a PDF and upload them.
  • Be careful to provide the right information. Your application might get canceled if you give wrong or incomplete details.

House line survey 

In the second step, members of the SNGPL company will visit your area to prepare a feasibility report for issuing a proposal letter, company experts will come to your place to see if it’s possible to give you gas. If it is, they’ll make a plan for the gas pipes when they visit your location.”

SNGPL new connection demand notice

You’ll receive a letter with a plan for your gas connection. We’ll also give you a list of approved contractors in your area.

You can choose any of these contractors to set up the gas pipes at the standard prices.

In the Demand Notice, you will find the complete explanation of the total cost required to activate your gas connection, along with a breakdown of all associated expenses. This notice provides a detailed account of the charges fees you need to pay to get your gas connection up and running. Understanding the Demand Notice is essential to have a clear picture of the financial requirements for starting your new gas connection.”

SNGPL l new connection installment check online

Pipeline Installation: 

“SNGPL or their authorized contractors will install the gas pipeline from the nearest distribution point to your property. This will include both low-pressure and high-pressure lines, as needed.”

House Installation:

 If your premises require an internal gas line, SNGPL or their authorized contractors will install it according to specified standards.”SNGPL, to make gas line installation easier, has appointed contractors for low and high-pressure house lines. These contractors will follow SNGPL’s guidelines, test the lines for leaks, and issue a report. Customers can choose their preferred contractor, pay for installation, and obtain the test report. Low-pressure customers don’t need a report for the company.”

Deposit

“To deposit, visit your nearest SNGPL office with the signed gas contract, house line plan, and installation certificate, along with a copy of your ID. Collect the deposit form or bill for security, service line charges, and other fees. Pay these amounts at the designated bank and keep the receipt.”

Gas connection 

“Gas connection will be provided on a first-come, first-served basis. The Distribution Department will lay the pipe up to your location, install the meter, and start the gas supply at your place.”

First bill payment 

“The first bill will be sent within 45 days of gas supply activation. If you don’t receive it within this period, contact your local regional office.”

Types of SNGPL gas connection 

“Sui Northern Gas Pipelines Limited (SNGPL) offers different types of gas connections based on your needs. Here are the main ones:

Domestic Connection: 

For homes, used for cooking and heating.

Commercial Connection:

 For businesses like restaurants and hotels.

Industrial Connection

 For big factories that need a lot of gas.

CNG Station Connection

For places that provide compressed gas for cars.

Agricultural Connection

 For farming needs like drying crops and irrigation.

To check the status of your new gas connection, if you applied in person at a Sui Gas office or through an agent, you can call 1199. When you speak with the helpline officer, provide the CNIC number used for the application.

To get a new gas connection in Pakistan, you’ll need:

  • Your CNIC copy.
  • Proof of property ownership.
  • A neighboring gas bill.
  • Keep your application receipt for reference.
  • You can apply for a new gas connection by visiting your local SNGPL office, filling out the application form, and providing the required documents.
  • You will just need a copy of your CNIC (Computerized National Identity Card), proof of property ownership, and a neighboring gas bill.

If your application is rejected, find out why, make necessary corrections, and reapply.